See what we did for Pret ...

Case Study // Pret

Client: Pret

Location: London Bridge

Installation: Full Electrical Installation

Date: May 2012

We have recently completed electrical installations for Pret A Manger refurbishments including this store at London Bridge. These projects for Pret require the shortest site programme possible and store trading throughout. We worked during the night to complete our installation to a high standard and on time. We look forward to further projects for Pret a Manger in 2012.

A Digital Addressable Lighting Interface (DALI) computerised lighting control system was installed, which provides Pret with four lighting scenes; Breakfast/Lunch scene, Evening scene, Shoulder Scene and Night Scene. Separate interfaces are installed for seating and take-away areas. Once our engineers have installed the DALI system our project manager attends site to interface and commission the lighting system.

Pret a Manger is a fast food chain based in the United Kingdom 85% of their trade is in London, as of January 2012, there were 230 UK shops, 168 in London.

Testimonial: What the client said..."Archer Electrical have carried out a number of contracts for Pret A Manger and we have found them to be an efficient, well organised Company who turn out good quality work on time"- Neil Armstrong, Barlow Group Ltd