See what we did for Toro Rosso ...

Case Study // Toro Rosso

Client: Toro Rosso

Location: Oxford, UK

Installation: Full Electrical Installation

Date: February 2010

Microlights Group appointed Archer Electrical to work in conjunction with them to upgrade the lighting at Scuderia Toro Rosso's Formula One factory in Bicester Oxfordshire.

The lighting was installed within the wind tunnel and when in operation it withstands winds equivalent to that of a Category 4 Hurricane (Sustained winds 131-155 mph [210-249 km/hr]).

The lighting is designed to assist the engineers in improving the aerodynamics of the car.

Testimonial: What the client said..."very pleased with the end result and the benefit it will have to the team."- Wind Tunnel Manager - Chris Saunders

Holly Farm, Clipstone Road, Edwinstowe, Nottingham, NG21 9JD

0115 966 7480

or enquire online »